Aviation, Homeland Security and Military
2022
- Electro-polishing + Hard Chrome plating, automatic.
- Mn-Phosphatization, barrels, automatic.
2017
2015
- Titanium etching and polish, manual.
- Aluminum etching and cleaning, manual.
2014
- Electro-polishing + Hard Chrome plating, automatic.
- Mn-Phosphatization, manual, barrels.
- Nitric Blackening, manual.
- Ultrasonic cleaning.
2014
- Cu (electro-less), Ni plating, gold plating, automatic. ** Including ZLD wastewater treatment plant with evaporator **
2007
Electronics and PCB
2021
- Cu plating, automatic, racks, fully encapsulated.
- Au plating, automatic, racks, fully encapsulated.
- Including ZLD wastewater treatment.
2017
- Cu-Sn-Ni plating line, Barrels, automatic.
2015
- Ni plating, automatic, barrels.
- Au, Cu plating, manual, hood-configuration.
- Wastewater treatment plant, 4 m3/hr.
2015-2018
- Various manual plating benches for Cu, gold.
2015
- Wastewater treatment plant, 10 m3/hr
2014
- Ni-Sn plating, automatic, barrels.
- 2 lines for Ni and Cu plating, manual, hood-configuration.
2012
- Ni – Gold Plating: Manual. Gold recovery electro-winning system.
- Holes plating line (Cu plating), Automatic.
2009
- Ni-Sn plating, automatic, barrels. 2 cranes, automatic chemical dosing.
2006
- Desmir line, Automatic, full encapsulation.
- Au, Cu Plating line, Automatic.
2000, 2015:
- Gold plating + Electroless Nickel plating line (ENG), Automatic. Built in 2000, upgraded in 2015.
Decorative and General Plating
2022
- Zinc plating line, automatic.
2019
- Preparation for painting + E-coat.
2018
- Zinc plating line, automatic.
- Cu, Ni, Cr plating (upgrade and relocation of the line)
2017
- Electro-less nickel, automatic.
2015
- Electro-less nickel (with anodic protection), semi-automatic, U shaped.
- Ni, Au, Cu, Ag, plating, manual, 36 process tanks.
2013
- Wastewater treatment plant, 15 m3/hr.
- Ni, Cr plating on plastic.
2012
- Gold plating line, manual.
2008
- Alkali zinc plating, automatic, 3 cranes.
2005
- Ni, Cr, plating, Automatic, including Cr+3 plating.
- Au, Ag, Cu Manual line, Wastewater treatment plant.
- ZLD wastewater treatment, with evaporator.
2003
- Cu, Au, Ag plating, manual.
2002
- Ni, Cr, plating, Automatic, biggest line in Israel.
Automotive, Renewable Energy and Heavy Machinery
(2000, 2012, 2013, 2017)
- Hard Chrome plating line + Wastewater treatment plant (2000, 2013) + E-coat line (2002, 2017).
2012, 2017
- E-coat and top coat for heavy machinery.
2000, 2013
- Hard chrome + Electro-polish for cotton-pickers’ parts.
2012
- Changing to Zinc-Nickel in Barrels
2008
- Zinc-phosphate in barrels
2006
- Alkali Zinc plating in Barrels